Construction products for smoke control and extraction
Fire- or temperature-resistant smoke extraction ducts and powered smoke exhaust ventilators are part of powered smoke control systems and serve to discharge smoke from the building in case of fire. For (CE-marked) powered smoke exhaust ventilators, a differentiation is made between ventilators installed in the room from which the smoke is to be extracted and those installed on the roof outside the building.
Various construction products, e.g. control units, are used to discharge smoke from lift shafts in case of fire.
Regulatory framework
DIBt grants national technical approvals (abZ)/general construction technique permits (aBG) for large-scale smoke extraction ducts as well as national technical approvals for construction products for smoke control in lift shafts.
DIBt also grants general construction technique permits for the installation of powered smoke exhaust ventilators in buildings or on rooftops (MVV TB 2020/1, A 2.2.1.16; Annex 14, Section 7.5.1).
Please also refer to the relevant provisions of the federal states following the MVV TB 2020/1, in particular Section A 2.2.1.16 and Annex 14, Section 7.
National procedure
A national technical approval (abZ) and/or oder general construction technique permit (aBG) is granted upon application (see Model Building Code (MBO), Sections 16a(2) and18(2) and (4)). This also applies to amendments and supplements to, or renewals of existing approvals and/or construction technique permits.
No formal requirements apply. The following information is needed: name and address of the applicant, description of the product and/or construction technique and its field of use or application, type of decision required (new decision, amendment or supplement to, or renewal of, an existing decision).
Please feel free to use the template below.
- pdf-Datei Application for a national technical approval and/or construction technique permit (4 pages ) Version: 10 April 2024; Application form
- pdf-Datei Application for amendment / supplementation / renewal of a national technical approval and/or construction technique permit (4 pages ) Last updated: 10 April 2024; Application form
- pdf-Datei Guideline: How to provide drawings for national technical approvals and general construction technique permits (5 pages ) Version: July 2017
Subject concerned | Applicant | Decision no. |
Validity
from / to |
---|---|---|---|
Entrauchungsleitung für eine Feuerwiderstandsdauer von 90 Minuten | Etex Building Performance GmbH Geschäftsbereich Promat Scheifenkamp 16 40878 Ratingen | Z-78.10-176 |
Z:
23.08.2023 G: 23.08.2028 |
Bauart zum Errichten von selbstständigen Entrauchungsleitungen aus THERMAX SL für eine Feuerwiderstandsdauer von 90 Minuten | MINERALKA d.o.o. Cesta pod Slivnico 24 SI 1380 CERKNICA SLOWENIEN | Z-78.10-248 |
Z:
17.07.2020 G: 17.07.2025 |
Bauprodukte Steuereinrichtung "LSF7000", Handsteuereinrichtung "HSE7000" und Lüftungshaube zur Rauchableitung aus Fahrschächten von Aufzügen im Inneren von Gebäuden | AUMÜLLER AUMATIC GmbH Gemeindewald 11 86672 Thierhaupten | Z-78.12-206 |
Z:
01.12.2021 G: 07.12.2026 |
Bauprodukte X-TRAC Steuereinheit "TRZ-Plus Comfort", Handsteuereinrichtung "RBH/3A" und Rauchableitungshauben zur Rauchableitung aus Fahrschächten von Aufzügen | Aufzugswerke Schmitt + Sohn GmbH & Co. KG Hadermühle 9-15 90402 Nürnberg | Z-78.12-246 |
Z:
21.06.2021 G: 21.06.2026 |
Bauprodukte LiSE CE Steuereinheit "TRZ-Plus Comfort", Handsteuereinrichtung "RBH/3A" und Rauchableitungshaube "SHEV Flap" zur Rauchableitung aus Fahrschächten von Aufzügen | Kingspan STG GmbH Trifte 72 32657 Lemgo | Z-78.12-247 |
Z:
25.10.2023 G: 24.11.2027 |